Team:AUC TURKEY/Notebook
From 2013hs.igem.org
(Difference between revisions)
m |
|||
Line 164: | Line 164: | ||
<li>As a result of the improvising, we decided to conduct research on only these 3 ideas for now: | <li>As a result of the improvising, we decided to conduct research on only these 3 ideas for now: | ||
<ul><li><b>Electrocortecoli</b><br/> | <ul><li><b>Electrocortecoli</b><br/> | ||
- | |||
The list of the research required for us to do is as follows: | The list of the research required for us to do is as follows: | ||
- | <ul><li>Finding the sequence of an adesion molecule which can be | + | <ul><li>Finding the sequence of an adesion molecule which can be implemented to E.coli</li> |
<li>Finding a way to electrocharge our E.coli</li> | <li>Finding a way to electrocharge our E.coli</li> | ||
<li>Searching iGEM to see if something which could be of use was done before</li> | <li>Searching iGEM to see if something which could be of use was done before</li> | ||
Line 177: | Line 176: | ||
The thermobacter will be able to sense temperature and react to it through producing urease which will cause the urea we add into the environment to be converted to uric acid. This reaction is endothermic and will result in the environment cooling down. Through this system, an automatic cooler through bacteria will be formed. | The thermobacter will be able to sense temperature and react to it through producing urease which will cause the urea we add into the environment to be converted to uric acid. This reaction is endothermic and will result in the environment cooling down. Through this system, an automatic cooler through bacteria will be formed. | ||
The list of the research required for us to do is as follows: | The list of the research required for us to do is as follows: | ||
- | <ul><li>Searching to see if this project was | + | <ul><li>Searching to see if this project was done before or if there is anything in iGEM that could be of use</li> |
<li>Finding the sequence for urease enzyme</li> | <li>Finding the sequence for urease enzyme</li> | ||
<li>Designating several ententities of the RNA Thermometer which can be of use</li> | <li>Designating several ententities of the RNA Thermometer which can be of use</li> | ||
Line 192: | Line 191: | ||
</ul></div> | </ul></div> | ||
<div><ul><li><b>Mineral-Fuser Bacter:</b> The research we conducted over the last week showed that it will be extremely difficult to do this as a project as there is already a lack of information on this matter. The only thing that we could find was that a certain type of bacteria has this property but scientists haven't identified how they do it.</li> | <div><ul><li><b>Mineral-Fuser Bacter:</b> The research we conducted over the last week showed that it will be extremely difficult to do this as a project as there is already a lack of information on this matter. The only thing that we could find was that a certain type of bacteria has this property but scientists haven't identified how they do it.</li> | ||
- | <li><b>A Revival of our old Idea Stone Miner:</b> | + | <li><b>A Revival of our old Idea Stone Miner:</b> With Furkan Beştepe's discovery in an multiple choice exam question, this idea be discussed once more.</li></ul></div> |
<div> | <div> | ||
<h3>15 March</h3> | <h3>15 March</h3> | ||
Line 224: | Line 223: | ||
We also designed the parts that we will be adding to the registry.<br/> | We also designed the parts that we will be adding to the registry.<br/> | ||
<h3>29 March</h3> | <h3>29 March</h3> | ||
- | Something so unpleasant became apparent to us today. | + | Something so unpleasant became apparent to us today. Oud advisor realized that the Brown Stanford 2008 Team had not submitted the sequence of the urease BioBrick to the parts registry. So basically, we cannot use the part in comfort as we now are not sure if the urease part will work or not. |
So we had to prepare a new work plan to desigante what we should do from now on. | So we had to prepare a new work plan to desigante what we should do from now on. | ||
<ol><li>Today we submitted the <b>Project Description</b> which was due for Sunday.</li> | <ol><li>Today we submitted the <b>Project Description</b> which was due for Sunday.</li> |
Revision as of 00:30, 21 June 2013