Team:St Pauls London/Procedures

From 2013hs.igem.org

(Difference between revisions)
Line 101: Line 101:
}
}
-
         a.no-decoration {
+
         a.mobile-link, a.mobile-link:hover, a.mobile-link:active {
-
                 text-decoration: none;
+
                 text-decoration:none;
-
                color: inherit;
+
         }
         }
Line 128: Line 127:
         div.drop-down-top {
         div.drop-down-top {
                 background-color: transparent;
                 background-color: transparent;
-
                 margin-bottom: -6px;
+
                 margin-bottom: -7px;
         }
         }
Line 228: Line 227:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 233: Line 233:
PROJECT
PROJECT
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Abstract"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Abstract"></html>
Line 258: Line 258:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 263: Line 264:
THE TEAM
THE TEAM
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Participants"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Participants"></html>
Line 280: Line 281:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 285: Line 287:
OTHER
OTHER
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Notebook"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Notebook"></html>

Revision as of 12:26, 9 May 2013

Contents

Procedures

Our project involves various different digest, ligation, transformation, purification and extraction steps. The PDFs below illustrate which methods we used (and at which stage they were used) during the construction of our operons.

Operons

Operon 1

Fortunately, this entire operon came as one single BioBrick, allowing us to save a lot of time by simply using the agar stab sent to us by iGEM HQ (after we had incorrectly resuspended the lyophilised plasmid) as our operon-containing bacterium.

Operon 2

Operon 3