Team:St Pauls London/Safety

From 2013hs.igem.org

(Difference between revisions)
Line 228: Line 228:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 233: Line 234:
PROJECT
PROJECT
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Abstract"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Abstract"></html>
Line 258: Line 259:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 263: Line 265:
THE TEAM
THE TEAM
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Participants"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Participants"></html>
Line 280: Line 282:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
 +
    <a class="a.mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 285: Line 288:
OTHER
OTHER
<html>
<html>
-
   </p></div></li></div>
+
   </p></div></a></li></div>
</html>
</html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Notebook"></html>
<html><div class="drop-down"><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Notebook"></html>

Revision as of 12:35, 9 May 2013

Safety

1. All procedures were carried out in a clean area. This area was set up as detailed below, and ensured that no external microorganisms contaminated plates or tubes.

   1a. Bunsen burners were on at all times, such that a updraft was always present.
   1b. Prior to any procedures taking place, the entire area which was to be used was scrubbed down with antiseptic.

2. All waste was disposed of in separate, marked bins. The contents of these were then incinerated.

3. Antimicrobial hand wash was systematically used upon entering and leaving the lab to ensure no genetically modified microorganisms could be released outside of the one projects labs in which procedures were carried out.

4. Sterile gloves were worn at all times.

5. Safety glasses were worn at all times.