Team:St Pauls London/Procedures

From 2013hs.igem.org

(Difference between revisions)
(Undo revision 4856 by Paul Fady (talk))
 
Line 39: Line 39:
                 display: none;
                 display: none;
         }
         }
-
 
+
/*----- HEADER -----*/
/*----- HEADER -----*/
#header {
#header {
Line 45: Line 45:
height: 150px;
height: 150px;
}
}
-
+
 
 +
     
#headerTitle {
#headerTitle {
text-align: right;
text-align: right;
Line 98: Line 99:
color: #F93;
color: #F93;
text-decoration: underline;
text-decoration: underline;
-
}    
+
}
-
+
 
         a.mobile-link, a.mobile-link:hover, a.mobile-link:active {
         a.mobile-link, a.mobile-link:hover, a.mobile-link:active {
                 text-decoration:none;
                 text-decoration:none;
Line 133: Line 134:
         }
         }
-
         ul.drop-down li.top-of-list { /*----- makes sure top item is always shown -----*/
+
         ul.drop-down li.top-of-list {
                 display: block;
                 display: block;
 +
                background-color: transparent;
 +
                color: black;
 +
                text-decoration: none;
         }
         }
                
                
Line 143: Line 147:
         ul.drop-down:hover li.top-of-list {
         ul.drop-down:hover li.top-of-list {
                 color: #F93;
                 color: #F93;
-
text-decoration: underline;            
+
text-decoration: underline;
         }
         }
Line 149: Line 153:
/*----- MAIN CONTENT -----*/
/*----- MAIN CONTENT -----*/
 +
 +
        .indent-content {
 +
                margin-left: 25px;
 +
        }
 +
 +
        .pdf {
 +
                text-align: center;
 +
        }
.title-link, .title-link:active, .title-link:visited {
.title-link, .title-link:active, .title-link:visited {
Line 214: Line 226:
   <ul class="drop-down">
   <ul class="drop-down">
   <div class="drop-down-top">
   <div class="drop-down-top">
-
   <li class="top-of-list">  
+
   <li class="top-of-list">
     <a class="mobile-link" href="">
     <a class="mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
Line 269: Line 281:
   <div class="drop-down-top">
   <div class="drop-down-top">
   <li class="top-of-list">
   <li class="top-of-list">
-
     <a style="text-decoration: none" href="">
+
     <a class="mobile-link" href="">
     <div class="nav_button">
     <div class="nav_button">
     <p class="nav_buttonText">
     <p class="nav_buttonText">
Line 288: Line 300:
<html><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Safety"></html>
<html><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Safety"></html>
SAFETY
SAFETY
-
----
 
-
<html></a></li></html>
 
-
<html><li><a class="nav_buttonLink" href="https://2013hs.igem.org/Team:St_Pauls_London/Attributions"></html>
 
-
ATTRIBUTIONS
 
----
----
<html></a></li></html>
<html></a></li></html>
Line 302: Line 310:
   </div>
   </div>
</html>
</html>
 +
===Procedures===
===Procedures===

Latest revision as of 11:47, 7 June 2013

Contents

Procedures

Our project involves various different digest, ligation, transformation, purification and extraction steps. The PDFs below illustrate which methods we used (and at which stage they were used) during the construction of our operons.

Operons

Operon 1

Fortunately, this entire operon came as one single BioBrick, allowing us to save a lot of time by simply using the agar stab sent to us by iGEM HQ (after we had incorrectly resuspended the lyophilised plasmid) as our operon-containing bacterium.

Operon 2

Operon 3