Team:Consort Alberta/notebook
From 2013hs.igem.org
(Difference between revisions)
Kris Glacier (Talk | contribs) (Created page with "<html><head><style> ul.navigation{list-style-type:none; Margin:0; padding:0;} li.navigation{ display:inline; font:18px arial bold; padding-right: 15px;} </style></head> <body> ...") |
|||
(19 intermediate revisions not shown) | |||
Line 4: | Line 4: | ||
padding:0;} | padding:0;} | ||
li.navigation{ | li.navigation{ | ||
- | display:inline; | + | display: inline; |
font:18px arial bold; | font:18px arial bold; | ||
padding-right: 15px;} | padding-right: 15px;} | ||
Line 19: | Line 19: | ||
<li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/safety">Safety</a></li> | <li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/safety">Safety</a></li> | ||
<li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/attributions">Attributions</a></li> | <li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/attributions">Attributions</a></li> | ||
- | <li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/sponsors">Sponsors</a></ | + | <li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/sponsors">Sponsors</a></li> |
- | + | <li class="navigation" ><a href="https://2013hs.igem.org/Team:Consort_Alberta/Contact">Contact Us</a></ul> | |
</body></html> | </body></html> | ||
+ | ---- | ||
+ | <html> | ||
+ | <h3>February</h3> | ||
+ | February 9/10, 2013. | ||
+ | <ul><li>The following is a link to Taylor Fawcett's notes on our Personal Bootcamp workshop presented by the Calgary iGEM team.</li> | ||
+ | <ul><li><a href="https://docs.google.com/a/plrd.ab.ca/file/d/1uIYhP9EWzOwlfAjplegJFg2X7lZBaK-wKRYdIYbJnH-ZKg9tmyMSOYKE6_QU/edit?usp=sharing">Taylor's Notes.</a> | ||
+ | |||
+ | |||
+ | </li></ul></ul> | ||
+ | <h3>March</h3> | ||
+ | <p>March 1, 2013. | ||
+ | <ol> | ||
+ | <li> Meetings are currently scheduled for Mondays and Tuesdays every week, unless otherwise stated.</li> | ||
+ | <li> Talked about a parental meeting on the 11th of March. </li> | ||
+ | <li> Workshop in Calgary (March 23/24). Who will be there? </li> </ol> | ||
+ | |||
+ | March 4, 2013. | ||
+ | <ol> | ||
+ | <li>Discussed plans for Parental Meeting, Workshop on 23/24th</li> | ||
+ | <li>"iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it. </li> | ||
+ | <li>Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.</li> | ||
+ | <ul><li><a href="http://www.youtube.com/watch?v=wuWDex5mh5Y">Originating idea.</a></ul> | ||
+ | <li>Covered various applications for travel and grants.</li></ol> | ||
+ | |||
+ | March 11, 2013. | ||
+ | <ol><li>Informed parents on...</li> | ||
+ | <ol><li>Synthetic Biology- what it is, how we do it, dangers, and benefits.</li> | ||
+ | <li>Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)</li> | ||
+ | <li> Costs for being in the iGEM group.</li></ol></ol> | ||
+ | |||
+ | March 18, 2013. | ||
+ | <ol><li>Covered what to bring to the iGEM workshop the following weekend.</li> | ||
+ | <ul><li><a href="http://geekstartermarch2013.eventbrite.ca/">Brief two day overview of Workshop.</a></ul></ol> | ||
+ | |||
+ | |||
+ | March 23rd and 24th, 2013. | ||
+ | <ul><li>Workshop from 10am to 5pm Saturday, and 9am to 3pm Sunday.</li> | ||
+ | <ul><li><a href="https://docs.google.com/document/d/1L1GHvI4sTqpMg5CIQwgWig0c-tFdp5MtB-bn-QtbotY/edit?usp=sharing">Notes on the 23/24 Workshop.</a></li></ul></ul> | ||
+ | |||
+ | March 25, 2013. | ||
+ | <ol><li>Talked about our next workshop on May 11/12. What we should have vs. What we need for the Workshop.</li> | ||
+ | <li>Talked about the Wiki Freeze (approx. June 16) and Competition at MIT.</li> | ||
+ | <li> Talked about possible sponsors.</li></ol> | ||
+ | <h3>April</h3> | ||
+ | April 29, 2013. | ||
+ | <ol><li>Choose a person for making a video/presentation.</li> | ||
+ | <li>Project has two circuits:</li> | ||
+ | <ol><li>Constutive (always on)- produces xylR. xylR binds with xylene. Now Detectable by promoter.</li> | ||
+ | <li>Regulative circuit. Stimulated by xylene-xylR molecule. Result: production of reporter (may be green fluorescent protein).</li></ol></ol> | ||
+ | <h3>May</h3> | ||
+ | May 11/12, 2013. | ||
+ | <ul><Li>This weekend we went to a workshop in Edmonton, and went over the following material...</li> | ||
+ | <ol><li>We presented our Presentation, and got tips and pointers towards how to improve.</li> | ||
+ | <li>We talked about our project and gained insight on how to make it better, and what device to test it with.</Li> | ||
+ | <li>There were a number of guest speakers (from Canada, New York, California, etc.) who gave helpful information on how to work our Human Practices.</li></ol></ul> | ||
+ | May 13, 2013. | ||
+ | <ol><li>Looking up parts for our Circuits.</li></ol> | ||
+ | <h3>June</h3> | ||
+ | June 10-21st, 2013. | ||
+ | <ul><li>Throughout the two weeks we worked diligently, to finish the Wiki, and Human Practices documentation.</li> | ||
+ | <li>We came in every week day to work on what we could, and prepare for the presentation in Boston.</li> | ||
+ | <li>There was a Public Presentation (Parents and Community) on June 18th.</li></ul> | ||
+ | |||
+ | </p></html> |
Latest revision as of 01:53, 22 June 2013
February
February 9/10, 2013.- The following is a link to Taylor Fawcett's notes on our Personal Bootcamp workshop presented by the Calgary iGEM team.
March
March 1, 2013.
- Meetings are currently scheduled for Mondays and Tuesdays every week, unless otherwise stated.
- Talked about a parental meeting on the 11th of March.
- Workshop in Calgary (March 23/24). Who will be there?
- Discussed plans for Parental Meeting, Workshop on 23/24th
- "iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it.
- Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.
- Covered various applications for travel and grants.
- Informed parents on...
- Synthetic Biology- what it is, how we do it, dangers, and benefits.
- Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)
- Costs for being in the iGEM group.
- Covered what to bring to the iGEM workshop the following weekend.
- Workshop from 10am to 5pm Saturday, and 9am to 3pm Sunday.
- Talked about our next workshop on May 11/12. What we should have vs. What we need for the Workshop.
- Talked about the Wiki Freeze (approx. June 16) and Competition at MIT.
- Talked about possible sponsors.
April
April 29, 2013.- Choose a person for making a video/presentation.
- Project has two circuits:
- Constutive (always on)- produces xylR. xylR binds with xylene. Now Detectable by promoter.
- Regulative circuit. Stimulated by xylene-xylR molecule. Result: production of reporter (may be green fluorescent protein).
May
May 11/12, 2013.- This weekend we went to a workshop in Edmonton, and went over the following material...
- We presented our Presentation, and got tips and pointers towards how to improve.
- We talked about our project and gained insight on how to make it better, and what device to test it with.
- There were a number of guest speakers (from Canada, New York, California, etc.) who gave helpful information on how to work our Human Practices.
- Looking up parts for our Circuits.
June
June 10-21st, 2013.- Throughout the two weeks we worked diligently, to finish the Wiki, and Human Practices documentation.
- We came in every week day to work on what we could, and prepare for the presentation in Boston.
- There was a Public Presentation (Parents and Community) on June 18th.