Team:Consort Alberta/notebook

From 2013hs.igem.org

(Difference between revisions)
Line 60: Line 60:
<li> Talked about possible sponsors.</li></ol>
<li> Talked about possible sponsors.</li></ol>
<h3>April</h3>
<h3>April</h3>
 +
April 29, 2013.
 +
<ol><li>Choose a person for making a video/presentation.</li>
 +
<li>Project has two circuits:</li>
 +
<ol><li>Constutive (always on)- produces xylR. xylR binds with xylene. Now Detectable by promoter.</li>
 +
<li>Regulative circuit. Stimulated by xylene-xylR molecule. Result: production of reporter (may be green fluorescent protein).</li>
<h3>May</h3>
<h3>May</h3>
 +
May 13, 2013.
 +
<ol><li>Looking up parts for our Circuits.</li>
<h3>June</h3>
<h3>June</h3>
 +
</p></html>
</p></html>

Revision as of 03:43, 20 June 2013


February

March

March 1, 2013.

  1. Meetings are currently scheduled for Mondays and Tuesdays every week, unless otherwise stated.
  2. Talked about a parental meeting on the 11th of March.
  3. Workshop in Calgary (March 23/24). Who will be there?
March 4, 2013.
  1. Talked about Parental Meeting, Workshop on 23/24th
  2. "iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it.
  3. Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.
  4. Covered various applications for travel and grants.
March 11, 2013.
  1. Informed parents on...
    1. Synthetic Biology- what it is, how we do it, dangers, and benifits.
    2. Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)
    3. Costs for being in the iGEM group.
March 18, 2013.
  1. Covered what to bring to the iGEM workshop the following weekend.
March 23rd and 24th, 2013. March 25, 2013.
  1. Talked about our next workshop on May 11/12. What we should have vs. What we need for the Workshop.
  2. Talked about the Wiki Freeze (approx. June 16) and Competition at MIT.
  3. Talked about possible sponsors.

April

April 29, 2013.
  1. Choose a person for making a video/presentation.
  2. Project has two circuits:
    1. Constutive (always on)- produces xylR. xylR binds with xylene. Now Detectable by promoter.
    2. Regulative circuit. Stimulated by xylene-xylR molecule. Result: production of reporter (may be green fluorescent protein).
    3. May

      May 13, 2013.
      1. Looking up parts for our Circuits.
      2. June