Team:Consort Alberta/notebook
From 2013hs.igem.org
(Difference between revisions)
Kris Glacier (Talk | contribs) |
|||
Line 37: | Line 37: | ||
March 4, 2013. | March 4, 2013. | ||
<ol> | <ol> | ||
- | <li> | + | <li>Discussed plans for Parental Meeting, Workshop on 23/24th</li> |
<li>"iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it. </li> | <li>"iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it. </li> | ||
<li>Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.</li> | <li>Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.</li> | ||
Line 45: | Line 45: | ||
March 11, 2013. | March 11, 2013. | ||
<ol><li>Informed parents on...</li> | <ol><li>Informed parents on...</li> | ||
- | <ol><li>Synthetic Biology- what it is, how we do it, dangers, and | + | <ol><li>Synthetic Biology- what it is, how we do it, dangers, and benefits.</li> |
<li>Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)</li> | <li>Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)</li> | ||
<li> Costs for being in the iGEM group.</li></ol></ol> | <li> Costs for being in the iGEM group.</li></ol></ol> | ||
Line 56: | Line 56: | ||
March 23rd and 24th, 2013. | March 23rd and 24th, 2013. | ||
<ul><li>Workshop from 10am to 5pm Saturday, and 9am to 3pm Sunday.</li> | <ul><li>Workshop from 10am to 5pm Saturday, and 9am to 3pm Sunday.</li> | ||
- | <ul><li><a href="http://geekstartermarch2013.eventbrite.ca/"> | + | <ul><li><a href="http://geekstartermarch2013.eventbrite.ca/">Brief two day overview of Workshop.</a></ul></ul> |
March 25, 2013. | March 25, 2013. | ||
Line 73: | Line 73: | ||
<ol><li>We presented our Presentation, and got tips and pointers towards how to improve.</li> | <ol><li>We presented our Presentation, and got tips and pointers towards how to improve.</li> | ||
<li>We talked about our project and gained insight on how to make it better, and what device to test it with.</Li> | <li>We talked about our project and gained insight on how to make it better, and what device to test it with.</Li> | ||
- | <li>There were a number of guest speakers who gave helpful information on how to work our Human Practices.</li></ol></ul> | + | <li>There were a number of guest speakers (from Canada, New York, California, etc.) who gave helpful information on how to work our Human Practices.</li></ol></ul> |
May 13, 2013. | May 13, 2013. | ||
<ol><li>Looking up parts for our Circuits.</li></ol> | <ol><li>Looking up parts for our Circuits.</li></ol> | ||
<h3>June</h3> | <h3>June</h3> | ||
June 10-21st, 2013. | June 10-21st, 2013. | ||
- | <ul><li>Throughout the two weeks we worked diligently | + | <ul><li>Throughout the two weeks we worked diligently, to finish the Wiki, and Human Practices documentation.</li> |
<li>We came in every week day to work on what we could, and prepare for the presentation in Boston.</li> | <li>We came in every week day to work on what we could, and prepare for the presentation in Boston.</li> | ||
<li>There was a Public Presentation (Parents and Community) on June 18th.</li></ul> | <li>There was a Public Presentation (Parents and Community) on June 18th.</li></ul> | ||
</p></html> | </p></html> |
Revision as of 23:56, 21 June 2013
February
Fevruary 9/10, 2013.- The following is a link to Taylor Fawcett's notes on our Personal Bootcamp workshop presented by the Calgary iGEM team.
March
March 1, 2013.
- Meetings are currently scheduled for Mondays and Tuesdays every week, unless otherwise stated.
- Talked about a parental meeting on the 11th of March.
- Workshop in Calgary (March 23/24). Who will be there?
- Discussed plans for Parental Meeting, Workshop on 23/24th
- "iGEM high school DNA Assembly Guide" handed out. Informed everyone to read it.
- Talked about project ideas. Prevailing idea at the time was an Algae Lamp for Photosynthesis.
- Covered various applications for travel and grants.
- Informed parents on...
- Synthetic Biology- what it is, how we do it, dangers, and benefits.
- Dates to remember- Future workshops, meeting times, and flights to and from Greenfield, Indiana. (Location changed since then.)
- Costs for being in the iGEM group.
- Covered what to bring to the iGEM workshop the following weekend.
- Workshop from 10am to 5pm Saturday, and 9am to 3pm Sunday.
- Talked about our next workshop on May 11/12. What we should have vs. What we need for the Workshop.
- Talked about the Wiki Freeze (approx. June 16) and Competition at MIT.
- Talked about possible sponsors.
April
April 29, 2013.- Choose a person for making a video/presentation.
- Project has two circuits:
- Constutive (always on)- produces xylR. xylR binds with xylene. Now Detectable by promoter.
- Regulative circuit. Stimulated by xylene-xylR molecule. Result: production of reporter (may be green fluorescent protein).
May
May 11/12, 2013.- This weekend we went to a workshop in Edmonton, and went over the following material...
- We presented our Presentation, and got tips and pointers towards how to improve.
- We talked about our project and gained insight on how to make it better, and what device to test it with.
- There were a number of guest speakers (from Canada, New York, California, etc.) who gave helpful information on how to work our Human Practices.
- Looking up parts for our Circuits.
June
June 10-21st, 2013.- Throughout the two weeks we worked diligently, to finish the Wiki, and Human Practices documentation.
- We came in every week day to work on what we could, and prepare for the presentation in Boston.
- There was a Public Presentation (Parents and Community) on June 18th.